- Postcode districts
- KT17, SM2, SM7
- Nearby
- Sutton, Ewell and Epsom
- Guide price
- £400–£1,700
- Typical time on site
- half a day to 1 day
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a new vanity unit cost in Banstead?
Guide price in Banstead: £400–£1,700 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Banstead including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Banstead
In Banstead we cover KT17, SM2 and SM7; we also cover Sutton, 1.9 miles away, and Ewell.
In Banstead, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We quote vanity unit work in Banstead after seeing the wall and pipework, so any re-tiling is on the quote from the start. Wall-hung vanities in Banstead homes are fixed to suit what the wall is built from, which we check at the survey.
Water across much of Surrey is hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Removal of the old basin and pedestal, or old vanity, and taking it away
- Testing for leaks and checking the trap holds its seal
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
- A new tap, trap and the correct slotted or unslotted waste for the basin
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Drawers or doors
Drawers keep things visible and reachable but lose some space to the trap. Doors give a deeper cupboard and cost less.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

