- Postcode districts
- RH1, RH2
- Nearby
- Reigate, Horley and Caterham
- Guide price
- £2,800–£6,700
- Typical time on site
- 2–5 working days
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a walk-in shower cost in Redhill?
In Redhill, a walk-in shower typically costs £2,800–£6,700 including VAT, based on South East England prices. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Tray and screen
- Tiling to the shower walls
Frameless upgrade
- Large tray and frameless screen
Tiled level floor
- Level threshold
Guide prices for Redhill including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Redhill
We cover every part of Redhill, including RH1 and RH2, and nearby Reigate (1.5 miles) and Horley (4.6 miles).
In Redhill, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We measure walk-in showers in Redhill so the tray and panel are sized together, which is what keeps the spray in. In a long, narrow Redhill en-suite, a walk-in tray along the back wall often works better than a square enclosure.
Supplies across most of Surrey are hard. If your supply in Redhill is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- An 8 mm or 10 mm toughened glass panel with a wall profile and support arm, or a frameless fixing
- A low-profile stone-resin tray, or a floor former with a linear drain for a tiled level floor
- Removal of the old bath or enclosure and making good to the walls and floor
- Tanking to the shower walls, and to the floor where it is tiled
Decisions to make first
Tray or tiled floor
A tray is quicker, costs less and has a small lip. A tiled floor with a linear drain sits level with the rest of the room and lets one tile run throughout.
Tray length
Go long rather than wide. A 1400 to 1700 mm tray with a 900 to 1200 mm panel leaves a dry walkway; a 1200 mm tray works but gives less margin for spray.
Rules that apply in England
In England, moving or adding lights, a fan or a shower circuit in a room with a bath or shower is notifiable under Part P. A tiled level floor that needs a new drain connection at the soil stack can bring in Part H.

