- Postcode districts
- SL6
- Nearby
- Marlow, Slough and Windsor
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a wet room cost in Maidenhead?
Guide price in Maidenhead: £6,700–£13,500 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Maidenhead including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Maidenhead
In Maidenhead we cover SL6; we also cover Marlow, 4 miles away, and Slough.
In Maidenhead, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We quote wet rooms in Maidenhead only after looking at the floor construction, because that is where most of the cost difference lies. If your Maidenhead home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Water across much of Berkshire is hard. If your supply in Maidenhead is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- Strip-out, waste removal, a final flow test to the drain and handover
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
Decisions to make first
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

