- Postcode districts
- RG19
- Nearby
- Newbury, Tadley and Basingstoke
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a wet room cost in Thatcham?
As a guide, budget £6,700 to £13,500 including VAT for a wet room in Thatcham; your written quote will pin it down. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Thatcham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Thatcham
In Thatcham we cover RG19; we also cover Newbury, 2.8 miles away, and Tadley.
In Thatcham, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. In a compact Thatcham bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet. If your Thatcham home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Most of Berkshire has hard water. If your supply in Thatcham is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A frameless glass screen fixed to the wall and floor
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Strip-out, waste removal, a final flow test to the drain and handover
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

