- Postcode districts
- SG8
- Nearby
- Letchworth Garden City, Biggleswade and Saffron Walden
- Guide price
- £6,400–£12,750
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Cambridgeshire
- Survey
- Free, at your home
What does a wet room cost in Royston?
For Royston, our guide range for a wet room is £6,400 to £12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Royston including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Royston
As well as Royston itself (SG8), we survey in Letchworth Garden City, Biggleswade and Saffron Walden.
Royston gets the same process as anywhere else: a free survey at your home and a written, itemised quote. We quote wet rooms in Royston only after looking at the floor construction, because that is where most of the cost difference lies. If your Royston home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Supplies across most of Cambridgeshire are very hard. If your supply in Royston is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- Strip-out, waste removal, a final flow test to the drain and handover
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

