- Postcode districts
- SS7, SS8
- Nearby
- South Benfleet, Hadleigh and Pitsea
- Guide price
- £6,400–£12,750
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does a wet room cost in Canvey Island?
Guide price in Canvey Island: £6,400–£12,750 including VAT, depending on the room and what you choose. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Canvey Island including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canvey Island
We cover every part of Canvey Island, including SS7 and SS8, and nearby South Benfleet (2.3 miles) and Hadleigh (2.5 miles).
Homes in and around Canvey Island vary, so we look at the floor, the walls and the water system before we price anything. For a wet room in a Canvey Island flat, the first step is the lease, because freeholder consent is often needed before any work starts. In a compact Canvey Island bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet.
Water across much of Essex is very hard. If your supply in Canvey Island is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
Decisions to make first
Floor tile
Matt or textured porcelain with good slip resistance. Mosaic gives extra grip on a centre-drain floor because of its many grout lines.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

