- Postcode districts
- W3, W4, W6
- Nearby
- Acton, Shepherds Bush and Fulham
- Guide price
- £7,500–£15,000
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a wet room cost in Chiswick?
Guide price in Chiswick: £7,500–£15,000 including VAT, depending on the room and what you choose. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Chiswick including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Chiswick
As well as Chiswick itself (W3, W4 and W6), we survey in Acton, Shepherds Bush and Fulham.
London homes in Chiswick often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Chiswick bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor. For a wet room in a Chiswick flat, the first step is the lease, because freeholder consent is often needed before any work starts.
Most of Greater London has very hard water. If your supply in Chiswick is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

