- Postcode districts
- LE1, LE3, LE4, LE5
- Nearby
- Wigston Magna, Earl Shilton and Loughborough
- Guide price
- £5,800–£11,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Leicestershire
- Survey
- Free, at your home
What does a wet room cost in Leicester?
Our guide price for a wet room in Leicester is £5,800–£11,500 including VAT. Labour costs in East Midlands put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Leicester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Leicester
In Leicester we cover LE1, LE3, LE4 and 1 more postcode districts; we also cover Wigston Magna, 4.3 miles away, and Earl Shilton.
In a city the size of Leicester, parking and access for a skip are worth sorting before the start date — we will ask at the survey. For a wet room in a Leicester flat, the first step is the lease, because freeholder consent is often needed before any work starts. If your Leicester bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Most of Leicestershire has hard water. If your supply in Leicester is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Strip-out, waste removal, a final flow test to the drain and handover
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

