- Postcode districts
- NE15, NE21, NE40
- Nearby
- Whickham, Newburn and Newcastle upon Tyne
- Guide price
- £5,400–£10,750
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Tyne and Wear
- Survey
- Free, at your home
What does a wet room cost in Blaydon-on-Tyne?
In Blaydon-on-Tyne, a wet room typically costs £5,400–£10,750 including VAT, based on North East England prices. Prices in North East England run at about 10% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Blaydon-on-Tyne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Blaydon-on-Tyne
We work right across Blaydon-on-Tyne — NE15, NE21 and NE40 — and in neighbouring Whickham and Newburn.
Blaydon-on-Tyne gets the same process as anywhere else: a free survey at your home and a written, itemised quote. For a wet room in a Blaydon-on-Tyne flat, the first step is the lease, because freeholder consent is often needed before any work starts. We quote wet rooms in Blaydon-on-Tyne only after looking at the floor construction, because that is where most of the cost difference lies.
Supplies across most of Tyne and Wear are soft. If that holds for your street in Blaydon-on-Tyne, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

