- Postcode districts
- NE29, NE30, NE33
- Nearby
- North Shields, South Shields and Whitley Bay
- Guide price
- £5,400–£10,750
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Tyne and Wear
- Survey
- Free, at your home
What does a wet room cost in Tynemouth?
Our guide price for a wet room in Tynemouth is £5,400–£10,750 including VAT. Labour costs in North East England put local prices at about 10% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Tynemouth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tynemouth
In Tynemouth we cover NE29, NE30 and NE33; we also cover North Shields, 0.9 miles away, and South Shields.
Homes in and around Tynemouth vary, so we look at the floor, the walls and the water system before we price anything. If you are planning a wet room in Tynemouth for level access, we design the fall and drain so the floor is flush from the doorway. If your Tynemouth bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Water across much of Tyne and Wear is soft. If that holds for your street in Tynemouth, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- Strip-out, waste removal, a final flow test to the drain and handover
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

