- Postcode districts
- B6, B7, B19
- Nearby
- Birmingham, Washwood Heath and Smethwick
- Guide price
- £5,900–£11,750
- Typical time on site
- 5–10 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a wet room cost in Aston?
As a guide, budget £5,900 to £11,750 including VAT for a wet room in Aston; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Aston including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Aston
We work right across Aston — B6, B7 and B19 — and in neighbouring Birmingham and Washwood Heath.
In Aston, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For a wet room in a Aston flat, the first step is the lease, because freeholder consent is often needed before any work starts. If you are planning a wet room in Aston for level access, we design the fall and drain so the floor is flush from the doorway.
Supplies across the West Midlands range from soft to hard depending on the source. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Aston. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A frameless glass screen fixed to the wall and floor
- Strip-out, waste removal, a final flow test to the drain and handover
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

