What does a wet room cost in the West Midlands?
Our guide range in the West Midlands is £5,900–£11,750 including VAT.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for West Midlands including VAT. Your itemised written quote after the free survey is the price that counts.
Which towns do we cover in the West Midlands?
- Birmingham
- Coventry
- Wolverhampton
- Dudley
- Walsall
- Solihull
- Sutton Coldfield
- West Bromwich
- Halesowen
- Stourbridge
- Smethwick
- Willenhall
- Tipton
- Bloxwich
- Wednesfield
- Washwood Heath
- Aston
- Shirley
- Brierley Hill
- Aldridge
- Acocks Green
- Bartley Green
- Wednesbury
- Kingswinford
Supplies across the West Midlands range from soft to hard depending on the source. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Birmingham. Hardness varies street by street, so check the figure for your postcode with your water supplier. If your Birmingham bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
What the job includes
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Slip-resistant porcelain floor tiles and wall tiling
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- Strip-out, waste removal, a final flow test to the drain and handover
- A frameless glass screen fixed to the wall and floor
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Screen size
A screen of 1200 mm or more keeps spray off the rest of the room in most layouts. In a very small wet room, expect the whole floor to get wet.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
A wet room inside an existing home does not need planning permission. In a flat, check the lease: freeholder consent is often needed, and both the leak risk and the sound insulation to the flat below matter. Electrics must meet BS 7671, with 30 mA RCD protection, at least IPX4 fittings in zone 1 up to 2.25 m above the shower floor, IPX5 where water jets are used, and no ordinary sockets within 3 m of zone 1.
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.