- Postcode districts
- B90, B91, B92
- Nearby
- Shirley, Acocks Green and Washwood Heath
- Guide price
- £5,900–£11,750
- Typical time on site
- 5–10 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a wet room cost in Solihull?
Our guide price for a wet room in Solihull is £5,900–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Solihull including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Solihull
In Solihull we cover B90, B91 and B92; we also cover Shirley, 1.6 miles away, and Acocks Green.
Across a large town like Solihull, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. If your Solihull home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. For a wet room in a Solihull flat, the first step is the lease, because freeholder consent is often needed before any work starts.
Hardness differs from one part of the West Midlands to the next. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Solihull. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out, waste removal, a final flow test to the drain and handover
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- Slip-resistant porcelain floor tiles and wall tiling
Decisions to make first
Floor tile
Matt or textured porcelain with good slip resistance. Mosaic gives extra grip on a centre-drain floor because of its many grout lines.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

