- Postcode districts
- B90, B91, B92
- Nearby
- Shirley, Acocks Green and Washwood Heath
- Guide price
- £6,400–£12,750
- Typical time on site
- 6–12 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a loft bathroom cost in Solihull?
Guide price in Solihull: £6,400–£12,750 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Solihull including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Solihull
We cover every part of Solihull, including B90, B91 and B92, and nearby Shirley (1.6 miles) and Acocks Green (2.9 miles).
Solihull has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. If your Solihull loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. If your Solihull home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options.
Supplies across the West Midlands range from soft to hard depending on the source. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Solihull. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

