- Postcode districts
- WF1, WF2, WF4, WF5, WF8, WF10 + 1 more
- Nearby
- Lofthouse, Ossett and Dewsbury
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Soft across most of West Yorkshire
- Survey
- Free, at your home
What does a wet room cost in Wakefield?
For Wakefield, our guide range for a wet room is £5,600 to £11,250 including VAT. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Wakefield including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wakefield
We cover every part of Wakefield, including WF1, WF2, WF4 and 4 more postcode districts, and nearby Lofthouse (3.2 miles) and Ossett (3.4 miles).
Wakefield is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If your Wakefield home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. We quote wet rooms in Wakefield only after looking at the floor construction, because that is where most of the cost difference lies.
Most of West Yorkshire is supplied with soft water. If that holds for your street in Wakefield, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Strip-out, waste removal, a final flow test to the drain and handover
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
Decisions to make first
Floor tile
Matt or textured porcelain with good slip resistance. Mosaic gives extra grip on a centre-drain floor because of its many grout lines.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

