- Postcode districts
- ME13
- Nearby
- Whitstable, Sittingbourne and Canterbury
- Guide price
- £2,200–£5,600
- Typical time on site
- 2–6 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a bath to shower conversion cost in Faversham?
Guide price in Faversham: £2,200–£5,600 including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Tray and enclosure
- Bath removed, tray in its place
Walk-in shower
- Concealed valve, rainfall head
Level-access floor
- Grab rails and seat options
Guide prices for Faversham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Faversham
We work right across Faversham — ME13 — and in neighbouring Whitstable and Sittingbourne.
Faversham gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If someone in your Faversham home is finding the bath side harder to step over, a low or level-access tray removes the problem. We check the floor under the bath during a Faversham survey where we can, because old leaks can leave soft boards.
Supplies across most of Kent are very hard. If your supply in Faversham is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Grab rails and a fold-down seat if you want them
- Boarding, tanking and re-tiling of the shower walls
- A glass enclosure, walk-in panel or frameless screen
- A survey of the bath space, the waste position, the floor and your water system
Decisions to make first
Enclosure or walk-in
An enclosure with a door keeps all the water in and suits a shorter space. A walk-in panel makes the most of the full 1700 mm length an old bath leaves.
How much to re-tile
Re-tile just the shower walls, or take the chance to re-tile the whole room so new and old tiles never have to match.
Rules that apply in England
In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

