- Postcode districts
- KT8, KT12, KT13
- Nearby
- East Molesey, Sunbury-on-Thames and Walton-on-Thames
- Guide price
- £2,200–£5,600
- Typical time on site
- 2–6 working days
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a bath to shower conversion cost in West Molesey?
Guide price in West Molesey: £2,200–£5,600 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Tray and enclosure
- Glass enclosure or walk-in panel
Walk-in shower
- Full-height tiling
Level-access floor
- Floor former and tanking
Guide prices for West Molesey including VAT. Your itemised written quote after the free survey is the price that counts.
Working in West Molesey
We cover every part of West Molesey, including KT8, KT12 and KT13, and nearby East Molesey (1.3 miles) and Sunbury-on-Thames (1.7 miles).
Being a smaller town does not change how we work in West Molesey: free survey, written quote, one team. For West Molesey houses with only one bath, we talk through whether to keep it before you decide. We check the floor under the bath during a West Molesey survey where we can, because old leaks can leave soft boards.
Most of Surrey has hard water. If your supply in West Molesey is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A low-profile tray, or a former and tanking for a level-access floor
- Silicone, a full-flow test and a tidy finish where the new tiling meets the old
- Repair or replacement of floorboards where the bath has left them soft or damaged
- Removal of the bath, panel and taps, and disposal of the waste
Decisions to make first
Safety extras
A fold-down seat, grab rails and a slip-resistant tray cost little at the time of fitting and are much harder to add later.
Your only bath?
If this is the only bath in the house, think about whether you, or a future buyer, will want one before you commit.
Rules that apply in England
In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

