- Postcode districts
- BT61
- Nearby
- Portadown, Dungannon and Craigavon
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of County Armagh
- Survey
- Free, at your home
What does a new bathroom design cost in Armagh?
Design comes with the job: the survey, layout and itemised quote are free. In Armagh, a complete designed, supplied and fitted bathroom typically costs £5,700–£10,500 including VAT. Prices in Northern Ireland run at about 12% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Armagh including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Armagh
As well as Armagh itself (BT61), we survey in Portadown, Dungannon and Craigavon.
Being a smaller town does not change how we work in Armagh: free survey, written quote, one team. A design survey in Armagh covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. Whether you are in Armagh or elsewhere in County Armagh, layout options come with an itemised written quote.
Water across much of County Armagh is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in Northern Ireland
In Northern Ireland, building control covers new drainage, structural changes and ventilation, which is set out in Technical Booklet K. There is no Part P, but the electrical plan should be designed, tested and certified to BS 7671.

