- Postcode districts
- M1, M2, M4, M8, M9, M11 + 13 more
- Nearby
- Salford, Old Trafford and Failsworth
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Manchester?
Design comes with the job: the survey, layout and itemised quote are free. In Manchester, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Manchester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Manchester
As well as Manchester itself (M1, M2, M4 and 16 more postcode districts), we survey in Salford, Old Trafford and Failsworth.
In a city the size of Manchester, parking and access for a skip are worth sorting before the start date — we will ask at the survey. We measure Manchester bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. Whether you are in Manchester or elsewhere in Greater Manchester, layout options come with an itemised written quote.
Water across much of Greater Manchester is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
Decisions to make first
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

