What does a new bathroom design cost in Old Trafford?
Design comes with the job: the survey, layout and itemised quote are free. In Old Trafford, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Old Trafford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Old Trafford
As well as Old Trafford itself (M16, M17 and M32), we survey in Stretford, Salford and Eccles.
Being a smaller town does not change how we work in Old Trafford: free survey, written quote, one team. If you are in Old Trafford and weighing a bath against a walk-in shower, the layout options show both with their prices. We measure Old Trafford bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Water across much of Greater Manchester is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.