- Postcode districts
- M21, M32, M33
- Nearby
- Stretford, Urmston and Old Trafford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Sale?
Design comes with the job: the survey, layout and itemised quote are free. In Sale, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Sale including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sale
In Sale we cover M21, M32 and M33; we also cover Stretford, 1.7 miles away, and Urmston.
Homes in and around Sale vary, so we look at the floor, the walls and the water system before we price anything. We measure Sale bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. If your Sale bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Greater Manchester are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

