Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater Manchester · M21

Shower installation in Sale

From M21 to M33, we survey and quote for shower installation across Sale. You get one point of contact and a fixed written price once the details are agreed.

£400–£3,300 inc VAThalf a day to 3 daysFree home survey
Thermostatic shower valve and rainfall head being installed, example for Sale
Postcode districts
M21, M32, M33
Nearby
Stretford, Urmston and Old Trafford
Guide price
£400–£3,300
Typical time on site
half a day to 3 days
Water
Soft across most of Greater Manchester
Survey
Free, at your home

What does a new shower cost in Sale?

Guide price in Sale: £400–£3,300 including VAT, depending on the room and what you choose. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.

Shower swap

£400–£950
  • Test and handover

New shower with enclosure

£1,400–£3,300
  • Pipework and waste

Guide prices for Sale including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Sale

We work right across Sale — M21, M32 and M33 — and in neighbouring Stretford and Urmston.

Homes in and around Sale vary, so we look at the floor, the walls and the water system before we price anything. If you want a shower in your Sale home that works when the boiler is off, an electric shower is worth considering, as long as the consumer unit can take the circuit. If you are replacing a failed electric shower in Sale, we check whether the existing cable and circuit suit the new unit.

Water across much of Greater Manchester is soft. If that holds for your street in Sale, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
  • Electrical connection by a qualified electrician, tested and certified
  • A bath screen, tray or enclosure where the shower is new
  • For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed

Decisions to make first

Exposed or concealed

An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.

Electric shower

Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.

Rules that apply in England

In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

More about shower installation

Shower installation in Sale: questions

How much does a new shower cost in Sale?

A new shower in Sale usually costs £400–£3,300 including VAT. The final figure comes down to what you choose and what we find at the survey; your written quote lists every item so you can see where the money goes.

Is the water hard in Sale?

Water across much of Greater Manchester is soft. If that holds for your street in Sale, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a new shower in Sale?

Building control for Sale is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a new shower take?

Allow half a day to 3 days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Sale.

Does an electric shower need its own circuit?

Almost always. An electric shower draws a large current, so it needs a dedicated circuit from the consumer unit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, with RCD protection. In England and Wales a new circuit is notifiable work. Swapping like for like onto an adequate existing circuit is simpler.

Shower installation in Sale

Book a free home survey in Sale. You get a measured layout and an itemised written price before anything is ordered.