- Postcode districts
- DA10
- Nearby
- Grays, Gravesend and Longfield
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new bathroom design cost in Swanscombe?
Design comes with the job: the survey, layout and itemised quote are free. In Swanscombe, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Swanscombe including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Swanscombe
As well as Swanscombe itself (DA10), we survey in Grays, Gravesend and Longfield.
Swanscombe gets the same process as anywhere else: a free survey at your home and a written, itemised quote. A design survey in Swanscombe covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If your Swanscombe bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Kent are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

