- Postcode districts
- PH1, PH2
- Nearby
- Auchterarder, Blairgowrie and Rattray and Crieff
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Perth and Kinross
- Survey
- Free, at your home
What does a new bathroom design cost in Perth?
Design comes with the job: the survey, layout and itemised quote are free. In Perth, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Labour costs in Scotland put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Perth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Perth
We work right across Perth — PH1 and PH2 — and in neighbouring Auchterarder and Blairgowrie and Rattray.
In a city the size of Perth, parking and access for a skip are worth sorting before the start date — we will ask at the survey. A design survey in Perth covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If your Perth bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Perth and Kinross is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in Scotland
In Scotland, a straight refit rarely needs a building warrant, but forming a new bathroom, altering drainage or structural work may. The Technical Handbook uses 15 l/s extract for a bathroom, and the Scottish Water Byelaws 2014 cover new water fittings.

