- Postcode districts
- PH1, PH2
- Nearby
- Auchterarder, Blairgowrie and Rattray and Crieff
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Perth and Kinross
- Survey
- Free, at your home
What does a bathroom renovation cost in Perth?
As a guide, budget £7,200 to £14,500 including VAT for a bathroom renovation in Perth; your written quote will pin it down. Labour costs in Scotland put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Perth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Perth
We work right across Perth — PH1 and PH2 — and in neighbouring Auchterarder and Blairgowrie and Rattray.
In a city the size of Perth, parking and access for a skip are worth sorting before the start date — we will ask at the survey. If you have just bought a house in Perth, renovating the bathroom before moving in saves living through the dust. In Perth flats, the title deeds and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Supplies across most of Perth and Kinross are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Repairs to rotten floorboards, joists or other timber found once the room is open
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in Scotland
In Scotland, structural work, altering drainage or forming a new bathroom may need a building warrant, which must be granted before that work starts. A straight refit rarely needs one. Electrical work is tested and certified to BS 7671.

