- Postcode districts
- N7, N19, NW5
- Nearby
- Highbury, Archway and Camden Town
- Guide price
- £2,800–£7,500
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom fitting cost in Holloway?
Guide price in Holloway: £2,800–£7,500 including VAT, depending on the room and what you choose. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- Tiling labour
Fit only, new layout
- Pipework and waste re-routed
Supply and fit
- One price for everything
Guide prices for Holloway including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Holloway
In Holloway we cover N7, N19 and NW5; we also cover Highbury, 1.1 miles away, and Archway.
In Holloway, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Holloway home runs on a combi boiler or an unvented cylinder, we check your chosen shower valve suits it before fitting. If you have bought a suite and need it fitted in Holloway, we check the product list before booking so the job is not held up by a missing part.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Unpacking and checking delivered items before day one, so damage or missing parts can go back to the seller early
- Boarding, tanking in the shower area and tiling labour, with tiles and adhesive from you or sourced by us
- Electrical work by a qualified electrician where lights, a fan or a shaver socket are changing
- First and second-fix plumbing: supplies, wastes, isolation valves and the connection to the soil stack
Decisions to make first
Making good
Decide whether you want the quote to cover making good and decorating, or to stop at the tiles so you can paint yourself.
Same layout or new
Keeping the layout keeps labour in the £2,200 to £4,000 range; moving the WC, shower or basin adds pipework and days.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.

