What does a bathroom renovation cost in Eltham?
Guide price in Eltham: £9,400–£18,750 including VAT, depending on the room and what you choose. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Eltham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Eltham
As well as Eltham itself (SE2, SE9, SE18 and 1 more postcode districts), we survey in Blackheath, Welling and Catford.
In Eltham, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Eltham home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. Whether your Eltham bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.