- Postcode districts
- CT14, CT16, CT17
- Nearby
- Folkestone, Deal and Canterbury
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a bathroom renovation cost in Dover?
Our guide price for a bathroom renovation in Dover is £8,400–£16,750 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Dover including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Dover
We cover every part of Dover, including CT14, CT16 and CT17, and nearby Folkestone (7 miles) and Deal (7.8 miles).
Homes in and around Dover vary, so we look at the floor, the walls and the water system before we price anything. If you have just bought a house in Dover, renovating the bathroom before moving in saves living through the dust. A renovation survey in Dover looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.
Most of Kent has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

