- Postcode districts
- LE1, LE3, LE4, LE5
- Nearby
- Wigston Magna, Earl Shilton and Loughborough
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Leicestershire
- Survey
- Free, at your home
What does a bathroom renovation cost in Leicester?
As a guide, budget £7,200 to £14,500 including VAT for a bathroom renovation in Leicester; your written quote will pin it down. We adjust the national guide for East Midlands, where prices are typically about 4% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Leicester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Leicester
We work right across Leicester — LE1, LE3, LE4 and 1 more postcode districts — and in neighbouring Wigston Magna and Earl Shilton.
Leicester is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If your Leicester home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. Whether your Leicester bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Water across much of Leicestershire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Repairs to rotten floorboards, joists or other timber found once the room is open
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

