Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Wiltshire · BA14

Bathroom renovation in Trowbridge

Need a bathroom renovation in Trowbridge? We plan it around your room and your budget, then do the whole job with one team and one contract.

£7,600–£15,250 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Trowbridge
Postcode districts
BA14
Nearby
Westbury, Melksham and Bath
Guide price
£7,600–£15,250
Typical time on site
8–15 working days
Water
Hard across most of Wiltshire
Survey
Free, at your home

What does a bathroom renovation cost in Trowbridge?

In Trowbridge, a bathroom renovation typically costs £7,600–£15,250 including VAT, based on South West England prices. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,100–£8,200
  • Same layout, new suite

Structural

£12,250–£22,500
  • Ventilation and lighting redesigned

Guide prices for Trowbridge including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Trowbridge

We cover every part of Trowbridge, including BA14, and nearby Westbury (4.2 miles) and Melksham (4.8 miles).

In Trowbridge, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you have just bought a house in Trowbridge, renovating the bathroom before moving in saves living through the dust. A renovation survey in Trowbridge looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.

Supplies across most of Wiltshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • Repairs to rotten floorboards, joists or other timber found once the room is open
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician

Decisions to make first

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Heating

Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Trowbridge: questions

What is the price of a bathroom renovation in Trowbridge?

A bathroom renovation in Trowbridge usually costs £7,600–£15,250 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

Is the water hard in Trowbridge?

Supplies across most of Wiltshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Trowbridge?

Building control for Trowbridge is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Trowbridge.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in Trowbridge

Book a free home survey in Trowbridge. You get a measured layout and an itemised written price before anything is ordered.