Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Wiltshire · BA12

Bathroom renovation in Warminster

Need a bathroom renovation in Warminster? We plan it around your room and your budget, then do the whole job with one team and one contract.

£7,600–£15,250 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Warminster
Postcode districts
BA12
Nearby
Westbury, Frome and Trowbridge
Guide price
£7,600–£15,250
Typical time on site
8–15 working days
Water
Hard across most of Wiltshire
Survey
Free, at your home

What does a bathroom renovation cost in Warminster?

In Warminster, a bathroom renovation typically costs £7,600–£15,250 including VAT, based on South West England prices. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,100–£8,200
  • Make good and decorate

Structural

£12,250–£22,500
  • New drainage route

Guide prices for Warminster including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Warminster

As well as Warminster itself (BA12), we survey in Westbury, Frome and Trowbridge.

Warminster gets the same process as anywhere else: a free survey at your home and a written, itemised quote. A renovation survey in Warminster looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. For listed and period properties in Warminster, we check early whether listed building consent applies to the work you have in mind.

Water across much of Wiltshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • Repairs to rotten floorboards, joists or other timber found once the room is open
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns

Decisions to make first

Pipe material

Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Warminster: questions

How much does a bathroom renovation cost in Warminster?

A bathroom renovation in Warminster usually costs £7,600–£15,250 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

Do you cover BA12 in Warminster?

Yes. We cover all of Warminster, including BA12, and nearby Westbury, Frome and Trowbridge. Survey visits are free and arranged at a time that suits you.

Is the water hard in Warminster?

Water across much of Wiltshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Warminster?

Building control for Warminster is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

Should I renovate the bathroom before or after other building work?

If you are also rewiring, replacing the boiler or replumbing the house, do the bathroom at the same time as those works or straight after their first fix. New pipes and cables are then run once, and fresh tiles are not disturbed later.

Bathroom renovation in Warminster

Book a free home survey in Warminster. You get a measured layout and an itemised written price before anything is ordered.