- Postcode districts
- BA12
- Nearby
- Westbury, Frome and Trowbridge
- Guide price
- £7,600–£15,250
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Wiltshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Warminster?
In Warminster, a bathroom renovation typically costs £7,600–£15,250 including VAT, based on South West England prices. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Warminster including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Warminster
As well as Warminster itself (BA12), we survey in Westbury, Frome and Trowbridge.
Warminster gets the same process as anywhere else: a free survey at your home and a written, itemised quote. A renovation survey in Warminster looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. For listed and period properties in Warminster, we check early whether listed building consent applies to the work you have in mind.
Water across much of Wiltshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

