- Postcode districts
- BA13
- Nearby
- Warminster, Trowbridge and Frome
- Guide price
- £7,600–£15,250
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Wiltshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Westbury?
Our guide price for a bathroom renovation in Westbury is £7,600–£15,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Westbury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Westbury
In Westbury we cover BA13; we also cover Warminster, 3.9 miles away, and Trowbridge.
Being a smaller town does not change how we work in Westbury: free survey, written quote, one team. In Westbury flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. Whether your Westbury bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Water across much of Wiltshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- New hot and cold pipework and wastes, with isolation valves to each fitting
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

