- Postcode districts
- SS16, SS17
- Nearby
- Basildon, Pitsea and Grays
- Guide price
- £4,800–£9,500
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does an en-suite cost in Stanford-le-Hope?
As a guide, budget £4,800 to £9,500 including VAT for an en-suite in Stanford-le-Hope; your written quote will pin it down. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting and extractor fan
Upgrade
- Walk-in shower or larger tray
New en-suite
- New stud walls, drainage and pump if needed
Guide prices for Stanford-le-Hope including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Stanford-le-Hope
As well as Stanford-le-Hope itself (SS16 and SS17), we survey in Basildon, Pitsea and Grays.
Homes in and around Stanford-le-Hope vary, so we look at the floor, the walls and the water system before we price anything. For an en-suite in Stanford-le-Hope, the first question at the survey is always where the waste can reach the soil stack. We quote new en-suites in Stanford-le-Hope only after checking the drainage route on site, so the price reflects the work your house actually needs.
Most of Essex has very hard water. If your supply in Stanford-le-Hope is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- An extractor fan ducted to outside, sized to the room and wired with an overrun timer or humidistat
- A shower tray or level-access former, an enclosure or walk-in panel, and a thermostatic valve
- IP-rated lighting, a shaver socket and the electrics done by a qualified electrician, tested and certified
- Stud walls with acoustic insulation and moisture-resistant board for a new en-suite
Decisions to make first
Night lighting
A mirror light or low-level LED strip on its own switch lets you use the en-suite at night without the full glare of the ceiling lights.
Refit or new en-suite
A refit keeps the existing drainage and walls. A new en-suite costs more because the walls, waste route, fan duct and electrics all start from nothing.
Rules that apply in England
In England, a new en-suite brings in Part H for the new connection to the soil stack, Approved Document F for ventilation, at 15 litres per second intermittent or 8 litres per second continuous extract, and Part P for the new circuits. The electrician should be registered with a competent person scheme, or the work notified to building control. On a refit, avoid replacing the fan with a less effective one.

