- Postcode districts
- N8, N10, N22
- Nearby
- Muswell Hill, Tottenham and Archway
- Guide price
- £5,600–£11,250
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does an en-suite cost in Wood Green?
Our guide price for an en-suite in Wood Green is £5,600–£11,250 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing en-suite, same layout
Upgrade
- Fitted furniture with storage
New en-suite
- Ventilation and electrics to regulations
Guide prices for Wood Green including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wood Green
In Wood Green we cover N8, N10 and N22; we also cover Muswell Hill, 1.3 miles away, and Tottenham.
In Wood Green, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Wood Green en-suite fan just blows into the loft, we can duct it properly to outside as part of the refit. If the en-suite in your Wood Green home was squeezed in by a previous owner, a refit is a chance to fix the door swing and the tray size.
Water across much of Greater London is very hard. If your supply in Wood Green is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A shower tray or level-access former, an enclosure or walk-in panel, and a thermostatic valve
- A pumped waste or macerator where gravity drainage is not possible, and only where the house already has a WC on gravity drainage
- A door that suits a tight space: inward, outward, sliding or a pocket door
- A short-projection or wall-hung WC and a compact basin chosen to keep the floor clear
Decisions to make first
Exposed or concealed valve
An exposed bar valve is quicker to fit and easy to service. A concealed valve looks cleaner but sits inside the wall, so plan how it will be reached for repairs.
Refit or new en-suite
A refit keeps the existing drainage and walls. A new en-suite costs more because the walls, waste route, fan duct and electrics all start from nothing.
Rules that apply in England
In England, a new en-suite brings in Part H for the new connection to the soil stack, Approved Document F for ventilation, at 15 litres per second intermittent or 8 litres per second continuous extract, and Part P for the new circuits. The electrician should be registered with a competent person scheme, or the work notified to building control. On a refit, avoid replacing the fan with a less effective one.

