What does a loft bathroom cost in Sheffield?
Guide price in Sheffield: £6,000–£12,000 including VAT, depending on the room and what you choose. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Shower, basin and WC replaced
Signature
- Pump or macerator where needed
New loft bathroom
- Formed in an existing loft room
Guide prices for Sheffield including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sheffield
We work right across Sheffield — S1, S2 and S3 — and in neighbouring Rotherham and Dronfield.
In a city the size of Sheffield, parking and access for a skip are worth sorting before the start date — we will ask at the survey. If your Sheffield loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. If your Sheffield loft shower is weak or the waste drains slowly, the fix is often in the pump or the pipe fall rather than the shower itself.
Supplies across most of South Yorkshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Sheffield. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A check of your hot-water system and of the pressure and flow you actually get at loft level
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
Decisions to make first
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Getting the water pressure
A pumped shower suits a gravity system with a cold tank; an electric shower heats cold mains water at the point of use; a combi or unvented cylinder gives mains pressure throughout.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.