- Postcode districts
- LU7
- Nearby
- Dunstable, Bletchley and Milton Keynes
- Guide price
- £500–£3,700
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Bedfordshire
- Survey
- Free, at your home
What does a new shower cost in Leighton Buzzard?
Guide price in Leighton Buzzard: £500–£3,700 including VAT, depending on the room and what you choose. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Leighton Buzzard including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Leighton Buzzard
We cover every part of Leighton Buzzard, including LU7, and nearby Dunstable (6.2 miles) and Bletchley (6.2 miles).
In Leighton Buzzard, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are replacing a failed electric shower in Leighton Buzzard, we check whether the existing cable and circuit suit the new unit. For Leighton Buzzard homes with a cold tank in the loft, we check the system before fitting anything, because a pump is only allowed on a gravity supply.
Water across much of Bedfordshire is very hard. If your supply in Leighton Buzzard is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
- A bath screen, tray or enclosure where the shower is new
- A check of your hot-water system, water pressure and flow rate
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
Decisions to make first
Thermostatic mixer
Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

