- Postcode districts
- TN9, TN10, TN11
- Nearby
- Tunbridge Wells, Sevenoaks and Crowborough
- Guide price
- £500–£3,900
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new shower cost in Tonbridge?
In Tonbridge, a new shower typically costs £500–£3,900 including VAT, based on South East England prices. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Tonbridge including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tonbridge
As well as Tonbridge itself (TN9, TN10 and TN11), we survey in Tunbridge Wells, Sevenoaks and Crowborough.
Homes in and around Tonbridge vary, so we look at the floor, the walls and the water system before we price anything. We test pressure and flow at Tonbridge surveys before recommending a shower, so you know how it will perform before you buy. For Tonbridge homes with a cold tank in the loft, we check the system before fitting anything, because a pump is only allowed on a gravity supply.
Water across much of Kent is very hard. If your supply in Tonbridge is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- Electrical connection by a qualified electrician, tested and certified
Decisions to make first
Digital shower
A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

