- Postcode districts
- PE30
- Nearby
- Wisbech, March and Spalding
- Guide price
- £500–£3,700
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Norfolk
- Survey
- Free, at your home
What does a new shower cost in King's Lynn?
For King's Lynn, our guide range for a new shower is £500 to £3,700 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for King's Lynn including VAT. Your itemised written quote after the free survey is the price that counts.
Working in King's Lynn
As well as King's Lynn itself (PE30), we survey in Wisbech, March and Spalding.
In King's Lynn, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your King's Lynn bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two. If you are replacing a failed electric shower in King's Lynn, we check whether the existing cable and circuit suit the new unit.
Most of Norfolk has very hard water. If your supply in King's Lynn is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- A bath screen, tray or enclosure where the shower is new
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
Decisions to make first
Exposed or concealed
An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

