- Postcode districts
- KT15, KT16, TW17
- Nearby
- Weybridge, Staines and Egham
- Guide price
- £500–£3,900
- Typical time on site
- half a day to 3 days
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a new shower cost in Chertsey?
Guide price in Chertsey: £500–£3,900 including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Like-for-like mixer or electric shower
New shower over bath
- Bath screen
New shower with enclosure
- Tiling to the enclosure
Guide prices for Chertsey including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Chertsey
We work right across Chertsey — KT15, KT16 and TW17 — and in neighbouring Weybridge and Staines.
Being a smaller town does not change how we work in Chertsey: free survey, written quote, one team. If the shower in your Chertsey home swings between hot and cold, a thermostatic valve is usually the fix. If your Chertsey bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.
Water across much of Surrey is hard. If your supply in Chertsey is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A bath screen, tray or enclosure where the shower is new
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- A check of your hot-water system, water pressure and flow rate
Decisions to make first
Power shower
A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.
Exposed or concealed
An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

