- Postcode districts
- B21, B66, B67
- Nearby
- West Bromwich, Birmingham and Aston
- Guide price
- £450–£3,400
- Typical time on site
- half a day to 3 days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a new shower cost in Smethwick?
Our guide price for a new shower in Smethwick is £450–£3,400 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Existing supply and position
New shower over bath
- Tiling the bath surround
New shower with enclosure
- Tray, enclosure and valve
Guide prices for Smethwick including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Smethwick
In Smethwick we cover B21, B66 and B67; we also cover West Bromwich, 2.1 miles away, and Birmingham.
Homes in and around Smethwick vary, so we look at the floor, the walls and the water system before we price anything. If you want a shower in your Smethwick home that works when the boiler is off, an electric shower is worth considering, as long as the consumer unit can take the circuit. We test pressure and flow at Smethwick surveys before recommending a shower, so you know how it will perform before you buy.
Hardness differs from one part of the West Midlands to the next. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Smethwick. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of your hot-water system, water pressure and flow rate
- Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- A bath screen, tray or enclosure where the shower is new
Decisions to make first
Head and handset
A handset on a riser rail is versatile and easy for rinsing; a fixed overhead head feels generous but needs strong flow behind it.
Digital shower
A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

