What does a bathroom strip-out cost in Hertfordshire?
Our guide range in Hertfordshire is £650–£1,900 including VAT. Prices in Hertfordshire run at about 6% above the UK guide, based on East of England labour rates.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Hertfordshire including VAT. Your itemised written quote after the free survey is the price that counts.
Which towns do we cover in Hertfordshire?
- Watford
- Hemel Hempstead
- Stevenage
- St Albans
- Welwyn Garden City
- Cheshunt
- Hatfield
- Bishops Stortford
- Borehamwood
- Hitchin
- Hoddesdon
- Letchworth Garden City
- North Watford
- Harpenden
- Bushey
- Hertford
- Rickmansworth
- Potters Bar
- Berkhamsted
- Ware
Most of Hertfordshire has very hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier. Strip-outs in Watford include the waste going away with a licensed carrier, so nothing is left on the drive or the pavement.
What the job includes
- Waste loaded and taken away by a licensed waste carrier
- Lights, fan, shaver socket and heated rail disconnected and made safe by a qualified electrician where needed
- Wall and floor tiles taken off with as little damage as possible to sound plaster
- The soil pipe sealed against smells once the WC is off
- Dust sheets and floor protection on the route out through the house
- Removal of the bath or shower tray, enclosure, basin, WC, furniture and accessories
Decisions to make first
Asbestos testing
In a home built before 2000, a sample test before work starts settles whether a ceiling coating, floor tile or boxing panel needs specialist removal.
Keep or lose the plaster
Tiles often come off leaving plaster that can be tiled again. If the plaster comes away with them, the wall is boarded or re-plastered.
Strip-out only or with prep
Strip-out only leaves walls and floors as found. With prep, walls are boarded or patched and the floor checked and overlaid, ready for fitting.
Timing
Strip out just before the fit rather than weeks ahead, so the house is without a bathroom for as short a time as possible.
Rules that apply in England
Homes built before 2000 can contain asbestos in textured ceiling coatings, old floor tiles, cistern lids and boxing panels, so suspect materials should be tested before strip-out if there is any doubt. Bathroom waste should be taken away by a licensed waste carrier. Disconnecting electrical items should leave every circuit safe and is a job for a qualified electrician, and any work near a boiler or gas pipe is for a Gas Safe registered engineer.
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

