- Postcode districts
- PO30, PO32, PO33
- Nearby
- Cowes, Ryde and Sandown
- Guide price
- £650–£2,000
- Typical time on site
- 1–2 working days
- Water
- Hard across most of the Isle of Wight
- Survey
- Free, dates by arrangement
What does a bathroom strip-out cost in Newport?
Our guide price for a bathroom strip-out in Newport is £650–£2,000 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. Travel and delivery to islands and remote areas are priced on your quote. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Newport including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newport
We work right across Newport — PO30, PO32 and PO33 — and in neighbouring Cowes and Ryde. Because Newport is further afield, we arrange survey visits in batches; tell us your timescale and we will confirm a date before you commit to anything.
Being a smaller town does not change how we work in Newport: free survey, written quote, one team. Landlords in Newport can book a strip-out to see the real condition of a damaged bathroom before choosing between a refit and a renovation. We time strip-outs in Newport for just before the fit, so you are not left without a bathroom while waiting for products.
Supplies across most of the Isle of Wight are hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Waste loaded and taken away by a licensed waste carrier
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
- Removal of the bath or shower tray, enclosure, basin, WC, furniture and accessories
- Dust sheets and floor protection on the route out through the house
Decisions to make first
Asbestos testing
In a home built before 2000, a sample test before work starts settles whether a ceiling coating, floor tile or boxing panel needs specialist removal.
The floor
Old vinyl or tiles on a ply overlay can come up with the ply. Tiles bonded to a screed may need grinding back or overlaying instead.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

