- Postcode districts
- GL7
- Nearby
- Stroud, Cheltenham and Swindon
- Guide price
- £700–£2,600
- Typical time on site
- 1–2 working days (added to a fit)
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does bathroom underfloor heating cost in Cirencester?
Guide price in Cirencester: £700–£2,600 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Electric mat
- Insulation board
Electric, larger room
- Electrician sign-off
Wet system
- Pipes linked to the heating
Guide prices for Cirencester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cirencester
We work right across Cirencester — GL7 — and in neighbouring Stroud and Cheltenham.
Being a smaller town does not change how we work in Cirencester: free survey, written quote, one team. For Cirencester homes having the bathroom floor replaced, underfloor heating adds one to two days to the fit. Where a Cirencester home already has a heat pump, or the heating is being altered, a wet underfloor system is worth comparing with electric.
Supplies across most of Gloucestershire are hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A dial, programmable or smart thermostat, with the supply RCD protected, tested and certified by a qualified electrician
- A check of the floor construction, the room's heat loss and where the thermostat and supply will go
- Resistance and insulation tests on the mat before, during and after tiling, with the readings recorded
- Bringing the system up to temperature gradually once the adhesive and grout have cured
Decisions to make first
Electric or wet
Electric is cheaper to install and quick to lay in one room. Wet costs more upfront but is usually cheaper to run where it is fed by a gas boiler or heat pump.
Floor finish
Tiles and stone pass heat through well. LVT and vinyl can work, but check the maximum floor temperature the flooring maker allows.
Rules that apply in England
In England, a new circuit for underfloor heating is notifiable under Part P, and so is connecting it to an existing circuit in a room with a bath or shower. The electrician either self-certifies through a competent person scheme or the work is notified to building control.

