What does a new vanity unit cost in Herefordshire?
Our guide range in Herefordshire is £350–£1,450 including VAT.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Herefordshire including VAT. Your itemised written quote after the free survey is the price that counts.
Which towns do we cover in Herefordshire?
Supplies across most of Herefordshire are moderately hard. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier. We quote vanity unit work in Hereford after seeing the wall and pipework, so any re-tiling is on the quote from the start.
What the job includes
- Isolation valves on the hot and cold supplies, so the tap can be changed later without draining the system
- Testing for leaks and checking the trap holds its seal
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
- Removal of the old basin and pedestal, or old vanity, and taking it away
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
One basin or two
Two basins help a busy household if the wall is long enough. In a smaller room, one basin with a longer top often works better.
Rules that apply in England
Replacing a basin with a vanity unit does not need planning permission or building regulations approval. The new tap must meet the water fittings rules, including protection against backflow, and the waste should connect to the existing drainage through a proper trap. If the unit has a light, or a lit mirror goes above it, the electrical work must suit the zone it sits in under BS 7671 and be RCD protected.
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

