- Postcode districts
- HR1, HR4
- Nearby
- Ross on Wye, Leominster and Ledbury
- Guide price
- £350–£1,450
- Typical time on site
- half a day to 1 day
- Water
- Moderately hard across most of Herefordshire
- Survey
- Free, at your home
What does a new vanity unit cost in Hereford?
As a guide, budget £350 to £1,450 including VAT for a new vanity unit in Hereford; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Hereford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hereford
As well as Hereford itself (HR1 and HR4), we survey in Ross on Wye, Leominster and Ledbury.
Hereford is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. Landlords in Hereford can have a worn basin replaced with a vanity unit in half a day to a day. If you have bought a vanity unit for your Hereford bathroom, fit-only installation covers connecting the tap and waste and testing for leaks.
Most of Herefordshire has moderately hard water. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A new tap, trap and the correct slotted or unslotted waste for the basin
- Removal of the old basin and pedestal, or old vanity, and taking it away
- Patching or re-tiling the wall where the old basin left gaps
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
Decisions to make first
Basin type
An inset or semi-recessed basin, a one-piece moulded top, or a countertop basin on a worktop. Countertop basins need a tall tap or a wall-mounted one.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

