- Postcode districts
- HR6
- Nearby
- Hereford, Ledbury and Great Malvern
- Guide price
- £350–£1,450
- Typical time on site
- half a day to 1 day
- Water
- Moderately hard across most of Herefordshire
- Survey
- Free, at your home
What does a new vanity unit cost in Leominster?
Guide price in Leominster: £350–£1,450 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Leominster including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Leominster
We cover every part of Leominster, including HR6, and nearby Hereford (11.7 miles) and Ledbury (18.8 miles).
Being a smaller town does not change how we work in Leominster: free survey, written quote, one team. Wall-hung vanities in Leominster homes are fixed to suit what the wall is built from, which we check at the survey. We quote vanity unit work in Leominster after seeing the wall and pipework, so any re-tiling is on the quote from the start.
Supplies across most of Herefordshire are moderately hard. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
- Isolation valves on the hot and cold supplies, so the tap can be changed later without draining the system
- Removal of the old basin and pedestal, or old vanity, and taking it away
Decisions to make first
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

