- Postcode districts
- DL16
- Nearby
- Bishop Auckland, Durham and Newton Aycliffe
- Guide price
- £5,400–£10,750
- Typical time on site
- 5–10 working days
- Water
- Moderately hard across most of County Durham
- Survey
- Free, at your home
What does a wet room cost in Spennymoor?
For Spennymoor, our guide range for a wet room is £5,400 to £10,750 including VAT. Prices in North East England run at about 10% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Spennymoor including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Spennymoor
We work right across Spennymoor — DL16 — and in neighbouring Bishop Auckland and Durham.
Spennymoor gets the same process as anywhere else: a free survey at your home and a written, itemised quote. In a compact Spennymoor bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet. If your Spennymoor home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Most of County Durham has moderately hard water. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Spennymoor. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- Slip-resistant porcelain floor tiles and wall tiling
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

