- Postcode districts
- DL4, DL14
- Nearby
- Spennymoor, Newton Aycliffe and Durham
- Guide price
- £5,400–£10,750
- Typical time on site
- 5–10 working days
- Water
- Moderately hard across most of County Durham
- Survey
- Free, at your home
What does a wet room cost in Bishop Auckland?
Guide price in Bishop Auckland: £5,400–£10,750 including VAT, depending on the room and what you choose. We adjust the national guide for North East England, where prices are typically about 10% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Bishop Auckland including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bishop Auckland
In Bishop Auckland we cover DL4 and DL14; we also cover Spennymoor, 4.2 miles away, and Newton Aycliffe.
In Bishop Auckland, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For a wet room in a Bishop Auckland flat, the first step is the lease, because freeholder consent is often needed before any work starts. We quote wet rooms in Bishop Auckland only after looking at the floor construction, because that is where most of the cost difference lies.
Water across much of County Durham is moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Bishop Auckland. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Slip-resistant porcelain floor tiles and wall tiling
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Floor tile
Matt or textured porcelain with good slip resistance. Mosaic gives extra grip on a centre-drain floor because of its many grout lines.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

