- Postcode districts
- CA28
- Nearby
- Workington, Barrow in Furness and Penrith
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Cumbria
- Survey
- Free, at your home
What does a wet room cost in Whitehaven?
In Whitehaven, a wet room typically costs £5,600–£11,250 including VAT, based on North West England prices. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Whitehaven including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Whitehaven
In Whitehaven we cover CA28; we also cover Workington, 6.7 miles away, and Barrow in Furness.
Being a smaller town does not change how we work in Whitehaven: free survey, written quote, one team. If your Whitehaven home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. If you are planning a wet room in Whitehaven for level access, we design the fall and drain so the floor is flush from the doorway.
Supplies across most of Cumbria are soft. If that holds for your street in Whitehaven, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out, waste removal, a final flow test to the drain and handover
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Slip-resistant porcelain floor tiles and wall tiling
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

