- Postcode districts
- TN23, TN24
- Nearby
- Faversham, Canterbury and Folkestone
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a wet room cost in Ashford?
In Ashford, a wet room typically costs £6,700–£13,500 including VAT, based on South East England prices. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Ashford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ashford
In Ashford we cover TN23 and TN24; we also cover Faversham, 11.6 miles away, and Canterbury.
In Ashford, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your Ashford home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. If your Ashford bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Water across much of Kent is very hard. If your supply in Ashford is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Slip-resistant porcelain floor tiles and wall tiling
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

